Indian Army finally hopes to get howitzer trail under way / Rahul Bedi.

By: Material type: TextTextPublication details: 2010Subject(s): In: Jane's Defence Weekly Vol 47 No 8, 24 February 2010, p.7 (122)Summary: Tests are to be conducted soon on two rival 155mm towed howitzers. These are from Singapore Technologies (FH2000) and BAE Systems (FH-77 B05 L52). Requirement is said to be 400 units.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Tests are to be conducted soon on two rival 155mm towed howitzers. These are from Singapore Technologies (FH2000) and BAE Systems (FH-77 B05 L52). Requirement is said to be 400 units.

There are no comments on this title.

to post a comment.